Projects The proof is in the work civil municipal structures transportation wastewater water supply AllCivilMunicipalStructuresTransportationWastewaterWater Supply Wauconda Lake Michigan Water Supply Project Lake County Public Works Department White Deer Run Reservoir & Pump Station Central Lake County JAWA Hunt Club Road & Washington Street Water Main Improvements Libertyville Cass Avenue Lift Station Interstate 70 Over East Little Creek Waterloo 3rd Street Reconstruction Wauconda, IL Aerobic Digesters Waterloo Water Supply, Treatment and Transmission Facilities O’Fallon, IL Distribution System Water Quality Improvements O’Fallon, IL Wastewater Treatment Plant Improvements – Phase 2 Lick Creek Road Safety Improvements Interstate 57 Reconstruction Giant City Road Intersection Improvements IL Route 111 Bridge Replacement Breese South Main Street Glenn Seeber Memorial Campground North Marion Street Safety Improvements Gurnee, IL O’Plaine Road Water Main Replacement County Highway 10 Resurfacing IL Route 159 ADA and Signal Upgrades Moore Street Reconstruction Phases 5, 6, and 7 Hoover Road Bridge Reconstruction Dudleyville Road Bridge Replacement Breese N. Cherry Street North Shore Water Reclamation District S4 Interceptor Sewer Relocation South 42nd Street Right Turn Lane to Veteran’s Memorial Drive and Signal Relocations Mount Olive Corrosion Control Study US Route 40 Resurfacing North Market Street Sidewalk Improvements Parking Lot Expansion – Breese Elementary School District 12 South Market Street Shared-Use Path Interstate 70, 270, and Triple I Resurfacing Libertyville, IL Chemical Phosphorus Removal Metropolis 12th Street Resurfacing Mount Vernon Industrial Park Metropolis Water Treatment Plant Improvements Miller City Road Emergency Flood Repairs County Highway 11 (Dillinger Rd) Reconstruction Greenville Idler Lane Reconstruction McKinley Road Bridge Reconstruction Old State Road Bridge Replacement Coulterville Corrosion Control Study Benton, IL Wastewater Treatment Facilities St. Joseph’s Hospital Outpatient Addition, Parking Expansion, Heliport, and Main Entrance Canopy Sidewalk and ADA Ramp Improvements Jamestown Road and Holy Cross Lane Roundabout Sheffer Construction and Development Best One Tire Site Design Salem Reservoir Boat Dock New Douglas Avenue Bridge Replacement Glen Ellyn CELL Reconstruction Waterloo Detention System North of Westview Acres Mater Dei Athletic Track & Field Beach Road Reconstruction O’Fallon, IL Wastewater Treatment Plant Improvements – Phase 1 North Pokey Road Bridge Replacement Jamestown Road Replacement New Baden Wastewater Treatment Plant