Glenn Seeber Memorial Campground

Kinkaid, Illinois

Project Cost

$765,000

Completion

2024

Client

Reed’s Creek Conservancy District

About

The Reed’s Creek Conservatory District in Kinkaid received a $376,541 CDBG grant to install water and sewer infrastructure for the Glenn Seeber Memorial Campground, supporting the development of a 30-site campground with road improvements and ADA-compliant restroom facilities across 14 acres.

Read More

Reed’s Creek Conservatory District in Kinkaid was awarded a CDBG grant in the amount of $376, 541 to complete the Glenn Seeber Memorial Campground Water & Sewer – Phase 1 project, which included the following activities:

Installation of water mains, sewer mains, 11 water services, 15 sewer services (4 sewer services to be stubbed up and capped), 2 septic tanks, 1 lift station, force main, leach field, and all appurtenances required to complete the project for 11 campsites of a proposed 30-site full-service campground. 

Additionally, road & site work was completed for the eleven sites. The project converted roughly 14 acres into a short- term camping facility that included 30 campsites. The main elements of the project consisted of:

  • 30 camping sites connected by 1,300 feet of newly constructed roadway (12-foot width)
  • Upgrades to 760 feet of existing roadway (18-foot width)
  • ADA-compliant restroom facilities

Services Provided

  • Design Engineering
  • Bidding Administration
  • Construction Engineering
    Water and sewer main installation
  • Septic tanks, lift station, force main, leach field
  • Road and site construction
  • ADA-compliant restroom facilities