by fourcegroup | Sep 24, 2026
Tick Ridge Road Bridge Replacement Pulaski County, Illinois Project Cost $4.2M Completion 2027 Client pulaski county highway department About The project replaced the existing bridge on Tick Ridge Road over Post Creek Cutoff with a 274-foot-long, 30-foot-10-inch-wide...
by fourcegroup | Aug 11, 2025
Interstate 70 Over East Little Creek Illinois Project Cost $8.2m Completion 2027 Client Illinois Department of Transportation About HMG led design and planning for replacing two Interstate 70 bridge structures over East Little Creek, including superstructure...
by fourcegroup | Aug 11, 2024
IL Route 111 Bridge Replacement Illinois Project Cost $8.9m Completion 2024 Client Illinois Department of Transportation About The project replaced a deteriorated southbound bridge on IL Route 111 near the Interstate 55/70 interchange with a new 3-span steel...
by fourcegroup | Aug 11, 2023
Hoover Road Bridge Reconstruction Washington County, IL Project Cost $320,000 Completion 2023 Client Washington County Highway Department, Illinois About The project replaced a narrow single-lane bridge with a wider two-lane precast prestressed concrete deck beam...
by fourcegroup | Aug 7, 2023
Dudleyville Road Bridge Replacement Bond County, Illinois Project Cost $1.1m Completion 2023 Client Bond County Highway Department, Illinois About The existing structure was a 12-foot-wide, single-lane bridge on an oil and chip roadway. The project involved...