North Shore Water Reclamation District S4 Interceptor Sewer Relocation
Gurnee, Illinois
Project Cost
$1.65m
Completion
2023
Client
North Shore Water Reclamation District
About
The project included the relocation of the District’s existing 30” interceptor sewer under Sheridan Road (IL 137) to facilitate IDOT’s installation of a new box culvert at Bull Creek. Approximately 420 LF of 30” PVC interceptor sewer was installed, including over 200 LF in 56” steel casing via tunneling.
Services Provided
- Preliminary Engineering
- Design Engineering
- Construction Engineering