North Shore Water Reclamation District S4 Interceptor Sewer Relocation

Gurnee, Illinois

Project Cost

$1.65m

Completion

2023

Client

North Shore Water Reclamation District

About

The project included the relocation of the District’s existing 30” interceptor sewer under Sheridan Road (IL 137) to facilitate IDOT’s installation of a new box culvert at Bull Creek. Approximately 420 LF of 30” PVC interceptor sewer was installed, including over 200 LF in 56” steel casing via tunneling.

Services Provided

  • Preliminary Engineering
  • Design Engineering
  • Construction Engineering