Lift Stations #11 & #12 Improvements

Village of Wauconda, Illinois

Project Cost

$759,600

Completion

2023

Client

Village of Wauconda, Illinois

About

The work for Lift Station #11 included the replacement of existing sanitary sewer; removal of two existing submersible pumps and reconfiguration of the wet well for the installation of three new 15 HP submersible pumps rated for 1,125 gpm; installation of corresponding pipe connections; new wet well hatch and appurtenances; and replacement of an existing junction box, electrical conduit and cable, and new pump control panel for additional pump.

The work for Lift Station #12 included the replacement of two 10 HP submersible pumps rated for 250 gpm; and installation of a new power panel, SCADA panel and appurtenances.

Services Provided

  • Preliminary Engineering
  • Design Engineering
  • Construction Engineering